KIRKAS GAYA

 
           
Our Shows For Special Events Dates Company profile Links Links

 Ventre

 Circus Acts

       

 Daydreaming

 Large acrobatic show

       

 Zman Avir

 Acrobatic performance

       

 Walk with I

 High Stunt-Flying

       
 

 

Installing the rig

   
 

 

Outdoor Indoor    

 

Installing the rig outdoor

Description Outdoor set-up sketch

Carbon fiber rig

Consisting of 2 gantries

5 masts with rigging

6 attachments in the ground (clamps or ballast)

 

 

Requirements

  18 m x 18 m  area (between attachments in the ground)

  working area as flat as possible

♦  height clerance : 8,50 m

  stage area : rope circle 10 m diameter

 

Rigging by clamping

Outdoor set-up sketch

The 2 gantries are rigged to 6 clamps in the ground and 4 clamps locking the masts feet

The clamps go 50 to 80 cm deep into the ground

Set-up : 1.30 h - Disassembly : 1 h 

Rigging by ballasting

Outdoor set-up sketch

10 ballasts

  6 ballasts as gantries rigging
    >  2 X 750 kg
    >  4 X 500 kg

  4 ballasts for masts feet locking

    >  4 X 100 kg

 

Set-up time : 1.30 h to 2.30 h ▪ Disassembly : 1 h
(depending on time require to handle the ballasts)

 

A few examples of ballating methods...

Equipment to be provided  

Sound

♦  ampifier

♦  2 loudspeakers

♦  I-Pod connecting cable

Lighting (for night performance only)

♦  5 PC on the ground

♦  10 PAR

♦  fitted on two pods (chocolate/amber colour)

Accomodating the spectators  

 

The spectators may be accomodated up to the stage area

materialised by the 10 m diameter rope circle.

 

The spectators should be located as close as possible

to this stage area.

 

People are welcome all around.

 



Hanging the rig indoor

Description Indoor set-up sketch

Metallic cross-beam and hanging rope

Requirements

  10 m x 15 m area (between attachments in the ground)

  hanging device for the rope

♦  hanging device for the cross-beam at 6 m high

♦  rigging the cross-beam with 4 stays

  stage area : rope circle 10 m diameter